LogoSoak
Soak
Phoenix · Scottsdale · Sedona · Albuquerque

Your yard wasn't built
for this. We'll fix that.

Concrete cutting, gas lines, electrical rough-in, and hydrotherapy-grade tub installation — one crew, one contract, for yards that other installers walk away from.

Before: cracked concrete patio with sagging fence, coiled garden hose, and rusted propane tank in corner
Before
After: flush-mounted seven-person hot tub set into new flagstone with cedar privacy screen, recessed LED step lighting, and steam rising against violet sky
After

← Drag to reveal the transformation

Licensed & Insured
We Pull All Permits
340+ Installs Completed
Most Jobs Under 2 Weeks
Deck Mounts
Concrete Cutting
Hillside Excavation
Gas Line Runs
Crane Drops
Permit Handling
Electrical Rough-In
Retaining Walls
Rooftop Installs
Full Outdoor Suites
Deck Mounts
Concrete Cutting
Hillside Excavation
Gas Line Runs
Crane Drops
Permit Handling
Electrical Rough-In
Retaining Walls
Rooftop Installs
Full Outdoor Suites
340+ Completed Installations

The jobs get harder as you scroll.
That's the point.

Every card below is a real job. Flip any card to see the challenge, how we solved it, and what the client said when we handed them the remote.

Row 01 — Straightforward Installs
Deck mounts, concrete cuts, standard electrical
Finished hot tub deck installation in Scottsdale backyard with string lights and desert landscaping
Standard Install

Scottsdale Deck Mount

Scottsdale, AZ

Tap to see the challenge →

Deck Install

Scottsdale Deck Mount

Challenge

Existing composite deck had undersized joists rated for 40 PSF. The 7-person tub required 120 PSF wet weight distribution.

Solution

Sistered all joists with LVL lumber, added a concrete pad below for point-load transfer, upgraded 50A sub-panel feed.

6 days
Timeline
6,200 lbs
Tub Weight
50A
Panel Upgrade

""First soak was the night we finished. My wife cried. Worth every dollar.""

Concrete patio being cut and excavated for flush-mount hot tub installation
Standard Install

Tempe Concrete Cut

Tempe, AZ

Tap to see the challenge →

Concrete Work

Tempe Concrete Cut

Challenge

4-inch slab with rebar grid over clay soil — flush-mount required 36 inches of excavation plus waterproof liner.

Solution

Diamond-blade saw, hydraulic jack to lift slab sections whole, gravel drainage bed, custom cedar surround to match existing fence.

9 days
Timeline
36 in
Depth
4.2 tons
Concrete Out

""You cannot tell there was ever a crack in that patio.""

Airbnb rental property backyard with new hot tub installation and privacy landscaping
Standard Install

Mesa Airbnb Retrofit

Mesa, AZ

Tap to see the challenge →

STR Optimization

Mesa Airbnb Retrofit

Challenge

Owner needed installation complete before peak season — 11-day window, city permit required, HOA approval pending.

Solution

Pre-pulled permit before deposit cleared, expedited HOA packet with engineering letter, ran 240V from existing panel with room to spare.

8 days
Timeline
+$40/night
Revenue Lift
3 days
Permit

""Listing went from $185 to $225/night the day we added the tub photos.""

Row 02 — Technical Builds
Hillsides, crane drops, long gas runs
Steep hillside lot in Sedona requiring retaining wall construction for hot tub installation
Technical Build

Sedona Hillside Drop

Sedona, AZ

Tap to see the challenge →

Hillside Engineering

Sedona Hillside Drop

Challenge

22-degree slope, no crane access from street. Tub had to be rigged 140 feet down a switchback path. Retaining wall permit required structural engineer stamp.

Solution

Contracted PE for stamped retaining wall drawings, rigged tub with come-along and skid system, poured 12-inch stem wall footing.

18 days
Timeline
6.5 ft
Wall Height
22°
Slope

""Every guest asks how we got a tub up here. That's the best marketing we've ever had.""

Crane rigging operation for hot tub installation over rooftop or backyard with limited access
Technical Build

Flagstaff Crane Drop

Flagstaff, AZ

Tap to see the challenge →

Crane Rigging

Flagstaff Crane Drop

Challenge

Walled courtyard, zero truck access, 8-foot gate opening. Only option was a 40-ton crane lift over the roofline from the street.

Solution

Coordinated city street closure permit, crane operator pre-planned lift with structural assessment of roof overhang, tub landed in 4-hour window.

2 days
Timeline
40 ton
Crane
32 ft
Lift Height

""I had three neighbors ask for your number before the crane was packed up.""

Split-level luxury backyard with upper and lower patio areas requiring complex plumbing routing
Technical Build

Paradise Valley Split Level

Paradise Valley, AZ

Tap to see the challenge →

Multi-Level Build

Paradise Valley Split Level

Challenge

Upper terrace install required 60-foot gas line run from meter through two retaining walls and a finished basement ceiling.

Solution

Flexible corrugated stainless steel tubing through pre-drilled conduit sleeves, pressure-tested before drywall close, dual-zone heating.

14 days
Timeline
60 ft
Gas Run
400k
BTU

""The gas fire pit and the tub on the same evening — that's the life.""

Row 03 — Full Outdoor Suites
Fire features, audio integration, rooftop engineering
Full outdoor living suite under construction with hot tub, fire pit, and pergola in Tucson desert
Full Suite

Tucson Desert Living Suite

Tucson, AZ

Tap to see the challenge →

Full Outdoor Suite

Tucson Desert Living Suite

Challenge

Raw desert lot, no existing utilities, 200-amp service upgrade needed, HOA design review, 6-week permit timeline.

Solution

Managed all trades (electrical, gas, concrete, landscape) under one contract. Submitted HOA packet with renderings, pulled all permits in parallel.

8 weeks
Timeline
6 crews
Trades
200A
Service

""We went from dirt to dinner party in 8 weeks. I didn't have to call a single subcontractor.""

Luxury outdoor wellness area with hot tub, integrated audio speakers, and gas fire features
Full Suite

Scottsdale Wellness Compound

Scottsdale, AZ

Tap to see the challenge →

Integrated Audio + Fire

Scottsdale Wellness Compound

Challenge

Client wanted Sonos outdoor audio, four gas fire bowls, tub, and automated LED landscape lighting on a single control app.

Solution

Low-voltage specialist wired Sonos architectural speakers, gas manifold with individual zone valves, Lutron outdoor lighting, all integrated into Control4.

11 weeks
Timeline
4
Audio Zones
4
Fire Features

""One button. Everything comes on. The neighbors think we have a resort.""

Rooftop terrace with structural reinforcement for hot tub installation and Sandia Mountain views
Full Suite

Albuquerque Rooftop Retreat

Albuquerque, NM

Tap to see the challenge →

Rooftop Install

Albuquerque Rooftop Retreat

Challenge

Flat roof rated at 20 PSF. Full-weight tub required 3x structural upgrade, waterproof membrane replacement, and NM commercial permit.

Solution

Structural engineer designed steel moment frame bolted to building core, new TPO membrane, drain integration, and 60A rooftop sub-panel.

6 weeks
Timeline
3× upgrade
Load Rating
4 stories
Height

""Sandia Mountains, city lights, and 104-degree water. This is the view I paid for.""

Three Types of Clients

Which one are you?

Dual-income homeowners enjoying their new hot tub installation in a transformed backyard
Homeowners

You've been pricing tubs for six months.

You know what you want. You're not sure your yard can take it — the slope, the slab, the HOA. We've heard all of it. We've built through all of it.

Slope & hillside lotsConcrete slab cuttingPermit handlingHOA approvals
Airbnb rental property with hot tub that commands higher nightly rates
Airbnb Hosts

A hot tub adds $40/night. The math isn't complicated.

Our Mesa clients average an 11-month ROI. We install fast enough to hit your next peak season.

+$40
per night, average lift
Contractors

Sub us for the rough-in. Keep your client happy.

We pull our own permits, show up on schedule, and have never caused a callback. 12 GCs sub to us regularly.

Own permit pulling
On-time, every time
Zero callbacks on record
How It Works

From first call to first soak.

Most jobs are done in under two weeks. The complicated ones take longer because they're complicated — not because we're slow.

01

Site Visit

We walk your yard, check the panel, measure access, and photograph everything. No charge, no obligation.

Same week
02

Engineering & Permits

We handle structural drawings, permit applications, and HOA packets. You sign once.

1–3 weeks
03

Installation

Concrete work, gas lines, electrical, the tub drop, and finish work — one crew, one contract.

4–18 days
04

First Soak

We walk you through controls, water chemistry, and winterization. You get in the water.

Day of completion
Real Clients

What they said when they got in.

"Six months of YouTube rabbit holes and three contractors who said "it can't be done." Soak showed up, looked at our slope for ten minutes, and said "we've done steeper." They weren't wrong."
9-day install on a 15° slope
Priya Ramaswamy, Scottsdale homeowner who hired Soak for hillside hot tub installation
Priya Ramaswamy
Homeowner · Scottsdale, AZ
"Added $42/night to my listing rate the week it was done. The tub paid for itself in eleven months. I'm putting one in the second property next spring."
+$42/night, ROI in 11 months
James Kowalczyk, Mesa Airbnb host with hot tub installation that increased nightly rate
James Kowalczyk
Airbnb Host · Mesa, AZ
"I sub the plumbing and electrical rough-in to Soak on every tub job now. They pull their own permits, they're on site when they say they'll be, and I've never had a callback."
12 jobs subcontracted, zero callbacks
DeShawn Okafor, Tucson general contractor who subcontracts hot tub rough-in to Soak
DeShawn Okafor
General Contractor · Tucson, AZ

Your yard can handle this.
We'll prove it.

Site visits are free. Most happen within 5 business days. If your yard is too complicated for us to build in, we'll tell you — but in 340 jobs, that's happened twice.

340+
Installations Completed
6 yrs
In Business
0
Callbacks on Record
4.9★
Average Review